Flucke DDS

   Project #07-060     

209 NW Blue Parkway Lee's Summit, MO 64063

File Available Format Format
Schedule Updated Completed MS Project 2007 JPG
Subcontractor Lien Waiver MS Excel  PDF 

       

Healthcare Construction, Dental Office Construction, John Flucke DDS 

Plan Documents are available HERE including 2 sets of Revisions

Updated: 12/24/2007    Finish Schedule Available Here        Tile Layout Here

Summary:  This is a 4,300 SF Ground Up Building Wood Framing, Masonry, Stucco, Concrete Tile Roof, Site Utilities, Curbs, Concrete, Asphalt, Aluminum windows, Wood Doors, Metal Frames, Metal Stud interior, Gyp. Board, Acoustical Ceiling, Insulation, Med. Gas, Fireplace, Architectural Casework, Ceramic tile, solid surface, Vinyl Flooring, Cove Base, MEP, Stain, Paint

OWNER FLUCKE DDS209 NW Blue Parkway Lee's Summit, MO 64063 
G.C. H&R Const.5403 W 40 Hwy Blue Springs, MO 64015816-229-4853
ARCHITECT Guy Gronberg113 SE 3rd Lee's Summit, MO 64063816-524-0878
DESIGNERRinda Hardman 12760 W. 87th St. Suite 111
Lenexa, KS 66215
 (913) 492-9232
 CIVIL ENGINEER Hamilton Sterrett231 SW Noel Lee's Summit, MO 64063816-525-4844
 MEP ENGINEER PKMR 8801 Ballentine Ste 200 Overland Park, KS 66214913-492-2400
 SUPERINTENDENT David Jaeger 5403 W 40 Hwy Blue Springs, MO 64015816-985-6870
 PROJ. MANAGER  Tom Baugh 5403 W 40 Hwy Blue Springs, MO 64015816-985-6884

Note to all Bidders: With all projects, you are liable for the entire set. If the architect has comments, specifications or other relevant information on pages other than "your trade" pages, you need to include it in your price structure. You must look over all pages for relevant information. Prices which exclude portions of the complete set of documents will be discarded.