Bank Building Construction is complete the owner has moved in and is currently operating out of their new facility. House and Renner is proud to provide top notch Bank Construction in our own home town of Blue Springs, MO
Summary: This is a 15,000 SF Ground Up Building 2 stories with full basement, Structural Steel, Wood Framing, Fire Sprinklers, Masonry, Stucco, TPO Roof, Site Utilities, Curbs, Concrete, Waterproofing, Elevator, Asphalt, Aluminum windows, Wood Doors, Metal Frames, Gyp. Board, Acoustical Ceiling, Insulation, Architectural Casework, Ceramic tile, Carpet, solid surface, Wood and Cove Base, MEP, Stain, Paint, Landscaping, Irrigation,
Bank 21
| Owner | Bank 21 | 3301 SW Hwy 7 Blue Springs, MO 64014 | 816-220-0400 |
| G.C | House & Renner Construction | 5404 SW US Hwy 40 Blue Springs, MO 64014 | 816-229-4853 |
| Architect | Edwin Korff Assoc. | 5250 W 94th Terrace Prairie Village, KS 66207 |
913-649-7566 |
| Designer | Dee Knott | 1104 North Main Street Carrollton, MO 64633-1922 |
816-220-0400 |
| Superintendent | Toby Choate | 5404 SW US Hwy 40 Blue Springs, MO 64014 | 816-985-3322 |
| Project Manager | Tom Baugh | 5404 SW US Hwy 40 Blue Springs, MO 64014 | 816-985-6884 |
At a recent contractor's appreciation luncheon all of the workmen were given thanks for their efforts in building the new Bank 21 in Blue Springs. Twila Gregg was presented with a plaque by Tom Baugh to commemorate the opening of the Bank 21 branch.

Temporary Facility
As part of the overall business plan, this customer felt it was very important to get a facility opened as quickly as possible. In this case a temporary facility was purchased and placed on the site while site utilities were upgraded in preparation for the new bank plans and permits moved forward. Site development included extending the 8" water main about 1,000 feet and installing a new fire hydrant on the property. The new facility was opened and banking business began prior to the completion of approved drawings on the final 2 story building.